Supply scope
The order record shows plate markings and inspections before dispatch. At the loading port, the cargo was covered with tarpaulins while awaiting the vessel. The record also documents supervision during loading.

PROJECT CASE
A Turkish shipyard placed a repeat order for 10,911 tonnes of shipbuilding steel plate in late 2022. Loading took place in January 2023.
The order record shows plate markings and inspections before dispatch. At the loading port, the cargo was covered with tarpaulins while awaiting the vessel. The record also documents supervision during loading.